E0prime 2004 data summary page


tb2004 homepage for E0prime links and daily run summary
Logbook (100MB) 3 June - 6 Sep 2004
E0prime temperature data

E0prime data was taken during 5 beam periods in 2004, primarily to investigate crystal radiation hardness.
E0prime comprised one supercrystal, SC03, with 25 crystals (10 BTCP, 15 SIC) and VPT readout, for the first 2 periods.
A second SC, SC04, was added from the 3rd period, with 15 crystals (3 BTCP, 2 Apatity, 10 SIC) with APD readout.
2 of the SIC crystals in SC04 were 'good' crystals from the Jan 2004 production. 8 of the SIC crystals were from the 2nd
but 'bad' production of May 2004, and are thought to have been contaminated from crucibles used for other types of crystals.
As a consequence these crystals were relatively radiation soft.

The SCs were read out with barrel VFE cards (approx 8-10k e- noise), to FE cards which were read out to Rose10 cards
in the control room.

Particular observations 
During the first period, and in particular during the 2nd period, the VPT response in SC03 was observed to change significantly
due to beam rate effects. As an example, from the 'Latest announcements' log, tb2004 homepage for Fri June 18, period 2:
          16.00: Back to 0mrad setting on T2
          Irradiating xtal 24
          09.46, 100 Hz laser suspended this morning, after run 69826
             
 - saw repeat of rapid VPT response change seen in period 1
          13.40, after run 69849, re-introduced 100 Hz laser, signal returns to previous level in ~1h
          15.11, 100Hz laser turned off, after run 69860
          15.20, 100Hz laser turned on again, after run 69862

         

The effect has since been replicated in the laboratory [1] [2].
The effects are most pronounced when VPTs are operated at low beam rates following periods of high beam rate activity.
The VPT rate effects were found to be minimized by running laser pulses (120GeV equivalent) at 100Hz into SC03 as shown in the plot above.
The 100Hz laser pulses provide the equivalent of 'constant' high level beam rates during VPT operation which help stabilize the VPTs. 
Data from the periods with the 100Hz laser in period 2 should be relatively reliable.
Data in period 1, in particular the initial calibrations, before high beam operation (>2k/burst), should be reliable.  

Period 1,  Thurs June 3 - Tue June 8, SC03
No 100Hz laser pulse operation for VPT stability in Period 1

Date Crystal

Run Type

S2 rate (k/burst) Runs Energy

VPT stability
status

Comments
 

18.30 Thu 3 Jun - 08.45 Fri 4 Jun

-

Setting up 1 68347-68404  - Probably OK Finding beam position wrt SC03
08.50 Fri 4 Jun - 13.00 Fri 4 Jun

-

Calibration 1 68405-68445 -120 Probably OK various difficulties, 3k ev only written/run etc
13:05 Fri 4 Jun - 17.00 Fri 4 Jun

-

Calibration 1 68446-68509 -120 Probably OK calibration over all xtals
17:15 Fri 4 Jun - 09.48 Sat Jun 5 21 Irradiation From 2.4 to 40 k/b 68510-68598 -120 ??????? interspersed with calibrations at 1k/b
Noted at 07.42 Sat June 5, after run 68585, double peak on sum of 4 xtals during 40k/b irradiation
Noted at 09:20 Sat 5 June, VPTs drawing 7nA on anode and dynode lines during 40k/b irradiation
10:10 Sat Jun 5 - 11.10 Sat Jun 5 - Calibration 1 68599-68615 -120 ??????? calibration on various xtals
11.20 Sat Jun 5 - 08.40 Sun Jun 6 5 Irradiation From 5 to 40k/b 68616-68761 -120 ??????? interspersed with calibrations at 1k/b
08.46 Sun Jun 6 - 07.52 Mon Jun 7 24 Irradiation From 2 to 40k/b 68762-68933 -120 ??????? interspersed with calibrations at 1k/b
08.02 Mon Jun 7 - 01.40 Tue Jun 8 15 Irradiation From 2 to 40k/b 68934-69062 -120 ??????? interspersed with calibrations at 1k/b

Detailed information for full sequence of runs, E0prime, Period 1

 

Period 2,  Mon June 14 - Mon June 21, SC03
Periods of 100Hz laser pulse operation for VPT stability indicated

Date Crystal

Run Type

S2 rate (k/burst) Runs Energy

VPT stability
status

Comments
 

18.32 Mon 14 Jun-09.35 Tue15Jun

-

Calibration 0.5 69315-69430  - Probably OK SC03 calibrations, some DAQ probs
10.00 Tue15 Jun - 16.15 Tue15Jun

21

Irradiation From 2 to 8k/b 69431-69467 -120 ???????  
16.30 Fri 4 June,  run 69468 onwards, laser stability pulses,  100Hz ON
16:35 Tue15Jun - 22.12 Wed 16Jun 21 Irradiation From 8 to 53k/b 69468-69641 -120 Possibly OK interspersed with calibrations at 0.5k/b
22:20 Wed 16 Jun-18.39 Thu 17Jun 5 Irradiation From 7 to 28 k/b 69644-69752 -120 Probably OK interspersed with calibrations at 0.5k/b
18:47 Thu 17 Jun-09.09 Fri 18Jun 24 Irradiation From 3.5 to 4 k/b 69753-69826 -120 Probably OK interspersed with calibrations at 0.5k/b

09.46 Fri 18 June, laser stability pulses OFF

09:47 Fri 18 Jun - 13.39 Fri 18Jun 24 Irradiation 4 k/b 69827-69849 -120 ~4h, NOT OK!!
see plot above
interspersed with calibrations at 0.5k/b

13.40 Fri 18 June, laser stability pulses, 100Hz ON

13.42 Fri 18 Jun - 15.10 Fri 18Jun - Calibration 0.5 69850-69860 -120 VPTs recovering Reach default value by ~15.10

15.11 Fri 18 June, laser stability pulses OFF

15.13 Fri 18 Jun - 15.16 Fri 18Jun - Laser - 69861-69862 -120 ?????? Off for only 3 minutes

15.15 Fri 18 June, laser stability pulses, 100Hz ON

15.20 Fri 18 Jun - 15.58 Fri 18Jun - Calibration 0.4k/b 69863-69867 -120 Probably OK  
16.52 Fri 18 Jun - 06.15 Sat 19Jun 24 Irradiation From 16 to 45 k/b 69868-69951 -120 Probably OK interspersed with calibrations at 0.5k/b
06.29 Sat 19 Jun - 17.16 Sat 19Jun 15 Irradiation From 16 to 42 k/b 69952-70013 -120 Probably OK interspersed with calibrations at 0.5k/b
17.35 Sat 19 Jun - 04.32 Sun 20Jun 20 Irradiation From 16 to 45 k/b 70015-70081 -120 Probably OK interspersed with calibrations at 0.5k/b
04.39 Sun 20 Jun - 21.00 Sun 20Jun 13 Irradiation From 16 to 45 k/b 70082-70178 -120 Probably OK interspersed with calibrations at 0.5k/b
21.12 Sun20 Jun - 01.55Mon 21Jun 3 Irradiation 45 k/b 70179-70206 -120 Probably OK interspersed with calibrations at 0.5k/b
02.11 Mon21Jun - 08.04Mon 21Jun 12 Irradiation 45 k/b 70207-70247 -120 Probably OK interspersed with calibrations at 0.5k/b
               
22.00 Mon 21 Jun-08.00 Tue22 Jun   Laser   70263-70278     No laser pulses, laser cooling problems
    Laser   70279-70295     No 100Hz

Detailed information for full sequence of runs, E0prime, Period 2

 

Period 3,  16.00 Sun 27 June - Wed 7 July, SC03 and SC04
100Hz laser pulse operation for VPT stability in SC03, only for calibration for 27/28 June

Date Crystal

Run Type

S2 rate (k/burst) Runs Energy

VPT stability
status

Comments
 

Laser stability pulses, 100Hz ON

18.13 Sun27Jun - 03.39 Mon28Jun

-

Calibration 0.8 70340-70401  -120 Probably OK Calibraton over all of SC03 AND SC04
04.03 Mon28Jun - 23.35Mon28Jun 32,33,34 E-scans 0.5 70402-70445 - Probably OK SC04 only from now on, to 5 Sep 2005

Detailed information for sequence of runs, to Wed 7 July, E0prime, Period 3

 

Period 4,  Wed 28 July - Fri 30 July, data SC04 only
No 100Hz laser pulse operation for VPT stability
Detailed information for sequence of runs, 28-30 July, E0prime, Period 4

 

Period 5,  Thu 2 Sep - Sun 5 Sep, data SC04 only
No 100Hz laser pulse operation for VPT stability
Detailed information for sequence of runs, to 2-5 Sep 7, E0prime, Period 5

Comments, questions? Contact Dave Cockerill
29.7.2005